- What is it?
- Reverberation time is basically how "loud" a room or space is. Specifically, the time (measured in seconds) that it takes for a certain noise level to drop 60 decibels (dB). The 60 decibel drop is an arbitrary decision to standardize the measurement, but it is a relatively useful choice, given it is about the difference between an orchestra at full fortissimo and the background noise in a room.
- Why is it important?
- Reverberation time contributes (or detracts) from the quality of a space in several ways, in different environments. Here's a chart showing optimum reverberation times for various rooms.
- The biggest difference (or at least the most recognized) is made in performing arts environments, one of our specialties.
- In choral or lyrical instrumental performance environments, a long reverberation time (like a cathedral) is desirable, stretching and blending the various sounds into one another, adding a great resonance to people's voices, making them sound better. It's probably no coincidence that people tend to sing in the shower, usually the room with usually the longest reverberation time, due to usually having all hard finishes.
- In lecture halls or spoken-word environments, a short reverberation time is desirable, as long reverberation times will blend the consonants together, making certain words hard to distinguish.
- In practice rooms and rehearsal halls, many musicians prefer to have short-resonance spaces, so as to be able to hear themselves accurately, without the embellishment and "sugar-coating" of a well-designed hall. (Though, some of us enjoy practicing in reflective stairwells, using the reverberation to fool ourselves into thinking we sound much better than we actually are.)
- Outside of performance buildings, reverberation times still make a difference:
- Often, the desire for low-maintenance finishes in restaurants and kitchens makes people select too many hard finishes. This results in a long-resonance space, and therefore makes for very loud, even unpleasant dining experiences, driving some customers away.
- In classrooms, studies have linked poor acoustical design with several metrics. Students who cannot make out what the teacher is saying tend to have lower test scores. Also, teachers who must continually shout over background noise tent to have to take more sick days.
- To hear the difference, check out an audio comparison at Armstrong Ceiling's website, here.
- How do we do it?
- Reverberation time is usually measured in the field by playing a sound, stopping it, then recording how long it takes for the sound level to drop 60 decibels. It can, however, be calculated ahead of time by taking the volume of the room (multiplied by a constant), and dividing it by the sum of the total Sabins of absorption in the room. See here for more detailed information.
- A sabin, named for the Harvard acoustic researcher who first researched reverberation times, is a measurement of absorption, whose units are curiously measured in area (m^2, or sqft.) However, to be a useful measurement in sabins, the area is multiplied by a coefficient of how much sound it absorbs. For example, a square meter (or square foot for imperial units) of open window reflects no sound, and so have a perfect coefficient of 1, and would be measured as one sabin. Something of the same size that reflects a quarter of the sound back would then be 0.75 sabins.
- Notably, since materials will absorb sound differently at different frequencies, a standardized metric, called the Noise Reduction Coefficient (NRC) exists to test a material at four common octave bands; at 250, 500, 1000, and 2000 Hz; (Approx Middle B4, B5, B6, and B7) and average performance between the four. Typical NRCs vary from 0.70-0.90 for high-absorption acoustic ceilings, to 0.05 for glass, brick, or gypsum board.
- These calculations can also be done in reverse, where we take a room of a desired size and desired reverberation time, and calculate out the required absorption needed, which we can then incorporate into the design of the room. Most projects we do this ourselves, but in highly sensitive cases like music schools and performance halls, we will partner with an acoustical consultant to get it just right.
- In many cases, the equations can be simplified, and a good reverberation time can be obtained by simply selecting a good ceiling and floor finish.
- However, in more specialized cases, we often need to add acoustical panels around or in the space, both to absorb sound, and to break up any strong echoes We also sometimes add movable curtains that can be opened to allow the acoustical qualities of the room to be changed as desired. All of these elements need to be carefully placed, both to work with the acoustic geometry of the rooms, as well as to fit within a coherent room design.
- When in the process do we do it?
- Early in the design process, we will take into account the desired volumes of spaces, and select a ceiling and a ceiling height that works for most of the simple spaces
- Later in the design process, for any particularly complicated or demanding spaces, we will look into any necessary additional acoustic panels or elements, and incorporate them into the design of the spaces.
- Where are some good examples that we've worked on?
- Casper College
- At Casper College, we worked closely with our acoustical consultants to properly balance the acoustics of all the major spaces. The required acoustic panels were treated as a design opportunity, helping to give character to the various spaces.
- The main concert hall was made up of glass-fiber-reinforced gypsum panels on the ceiling and walls to evoke the windswept plains of the area, while diffusing the sounds throughout the hall, with absorbing panels at the rear. There are also absorptive curtains that can be deployed in front of these diffusive panels that will allow the users to controls the acoustics of the space.
- In the instrumental and choral rehearsal halls, the adjustable acoustic curtains were hidden by pilasters that, along with the curved acoustic diffuser wall panels, also give detail and a human scale to the large space.
- At the percussion rehearsal hall, absorptive wall panels were placed both low and high, to avoid reflective standing waves and flutter echoes, while the mid-height diffusive acoustic wall panels were woven together with both absorptive and diffusive concrete blocks, to accomodate the deeper tones of a percussion suite. They were carefully placed on the walls as an expression of the common basic rhythms that percussionists play, while additional glass-fiber-reinforced panels from the main auditorium were hung in the space to diffuse the sound from below.
- Mimosa Park Elementary
- At Mimosa Park Elementary we preemptively addressed acoustical concerns about an overly-loud cafeteria space by spraying a acoustical treatment onto the ceiling, adding acoustical panels on all walls, and adding hanging acoustic panels in the center of the space. This was done early enough in the design and construction process that all of these elements were folded into the coherent design of the cafeteria, instead of tacked on afterwards.
- JB Martin Gymnasium
- At JB Martin Gym, we were specifically tasked with fixing the acoustics of an existing gymnasium, that was far too "loud" a space to be useful. Nearly all speech was unintelligible, even through the loudspeakers, and being in the space during a loud athletic event was almost unbearable. HMS remedied the situation by applying a sprayed acoustic ceiling to the entirety of the gym ceiling, as well as placing acoustic wall panels at the perimeter, solving the school's problem, even with an increased capacity of the gym.
Wednesday, November 4, 2015
What We Do: Architectural Acoustics: Reverberation time
Wednesday, September 2, 2015
FAQ: How Much Does A New Rehearsal Hall Cost: Budgeting For Planning Music Rehearsal Facilities
Pdf version is downloadable here
![]() |
| Casper College Instrumental Rehearsal Hall |
Detail level of estimates
Building Efficiency
![]() |
For reference, above is a color-coded first floor plan of the HMS-designed Casper College School of Music. The overall area is shown in grey and black, while only the red areas are programmed spaces, only 56% of the total area, but relatively high for a performing arts facility. This particular floor is 27,000 SF, and with the second floor above it, the building was 35,000 SF total. The cost of construction was about $12.7 million, in 2012 dollars, a relatively cost-effective $370 per square foot. It is also worth noting that this building includes a performance hall, which is outside the scope of these estimates.
|
Cost per Square Foot
Cost of Construction (Hard Costs)
Soft Costs
Total Project Cost
Inflation adjustments
Common Spaces
Below is a chart showing the approximate costs of common spaces. Not every building will need every space, and certain programs may be able to easily squeeze into smaller spaces than the full-sized theoretical optimum. Usually, programs grow from existing spaces, and can re-purpose those spaces for new uses that fit. Every program, every site, and every need will be different per project, and every building should be carefully tailored by knowledgeable experts to meet those needs, which is why we are here. However, these numbers should be enough to allow for some long term planning for the future of your music programs.(As reprinted in the program for the 2015 annual conference of the International Council of Fine Arts Deans)
Pdf version is downloadable here
More about HMS-designed Performing Arts Projects
More about HMS-designed Educational Projects
More about Casper College School of Music
Wednesday, April 22, 2015
Case Study: Renderings vs Reality at Casper College School of Music
The program we used (the then-cutting edge Autodesk Revit 2011&2012,) allowed us (and our consultants) to model the entire building in the computer before anything was built, allowing us to more accurately visualize how the finished product will generally look. There are several schools of thought in terms of renderings, but we generally strive towards accuracy, minimizing the amount of embellishment. There are, of course, levels of detail that are not always present. For example, often we don't need to spend time modeling the light switches and exit signs to get a good sense of the space, but in general, with a more accurate rendering, the client is made aware of the final appearance of the space, and if any problems are found early on, they can be addressed before they become expensive change orders during construction.
When the project was completed, HMS hired a photographer to document the same spaces. See below for the comparison, to show how closely the renderings (created entirely in the computer while the site was a grass field) compared to the real world building, more than a year later.
Concert hall from back rear. Rendering is on top, final picture below. This rendering is from relatively early in the process, and there has been some subtle tweaking of the design during the final CD stage and construction, notably in the upper ceiling and wall panels, and the lower railings.
Concert hall from center. This rendering has been updated, showing the revised railings, wall panels, and ceiling panels, changed during value engineering.
Instrumental Rehearsal hall. Rendering is on top, final picture below. Both views are from the back of the room towards the front, but are from opposite corners - the whiteboard is the same. For reference, the room is more or less symmetrical, except for the window. The curtain is adjustable, and can be opened or closed to suit the acoustics of the room.
Front Lobby. Rendering at top, final image below. All the elements are in place, minus the owner-supplied furniture. The color balance differs slightly, with reality feeling brighter and fresher than the warm and dark rendering.
Upstairs Lobby Rendering is on the top, with final photo on the bottom. Geometry is essentially identical, along with colors. There are only a few special system and owner-supplied elements missing from the renderings, and the room in general "feels" darker than reality.
For reference, this building was modeled in then-cutting edge Autodesk Revit 2011 and 2012, and rendered in the same program, on our local computers. Since then, we have continually improved our rendering technology and skills to create better and more-accurate renderings.
Tuesday, October 15, 2013
Casper College Music Building Dedication
More about the Casper College School of Music Building at the HMS Architects website
More about HMS-designed music schools and other performance Projects
More about the Casper College School of Music
More about Casper College
Wednesday, October 2, 2013
HMS to host tour of facilities as part of ICFAD conference in New Orleans
More about ICFAD and their New Orleans Conference
More about the LSU Student Union Theater
More about the LSU Music & Dramatic Arts Building
More about HMS Fine and Performing Arts projects
Wednesday, November 14, 2012
LSU M&DA Wins AIA Gulf States Award
The architect lovingly restored the existing building and made additions that did not detract or compete with the original structure. The proscenium theater, in particular, was restored to its original glory. The architect inserted new life safety systems unobtrusively, preserving the high spirits of this glorious Art Deco building.HMS is honored by the building's selection.
From the HMS website:
Louisiana State University built the original Music & Dramatic Arts Facility in 1932. This large Italian Renaissance building is recognized in the State Register of Historic Places, but lacked the modern amenities necessary to properly support the college’s music and theater programs. In addition, the basic common areas were substandard in function and safety.More about the award at the AIA website (see fourth slide)
HMS managed the programming for the entire renovation. The performance spaces needed a significant overhaul, however the academic and support spaces were the largest challenge. The facility needed new classrooms, faculty offices, research rooms, libraries and storage. HMS Team had to first understand the department goals, changing curriculum and class scheduling.
The final design brought new clarity to the circulation and visual balance to a discordant series of prior additions and related buildings. Our solution restores and enhances the distinctive art deco elements of the original 400-seat proscenium theatre and main lobby
The new design overhauls an obsolete building infrastructure while working within the boundaries of a very restricted site and budget.
More about the award-winning LSU Music and Dramatic Arts Building at the HMS Architects website
More about HMS-designed music schools and other performance Projects
Tuesday, April 3, 2012
HMS Wins AIA Award for LSU Music and Dramatic Arts Building
In 2009 HMS Architects completed the Renovations and Additions to the Louisiana State University Music and Dramatic Arts Building. The project demolished several additions to the original 1928 building and infilled these areas creating a complete envelope which maintained the campus standard look to the exterior. The Art Deco proscenium theatre and lobby were restored, highlighting decorative elements including plaster scrolling, terrazzo floors, marble wainscoting and plaster proscenium. New classrooms, offices, shops and rehearsal spaces were created throughout the building, providing the School with all of their programmatic needs within a historic shell, complete with all of today's technology, comfort, accessibility and life safety needs.
Monday, September 12, 2011
HMS and the LSU Student Union featured in the LSU Alumni Magazine.
The article can be found starting on page 30, both embedded below and on the original site at:
http://issuu.com/lsualumni/docs/lsumagfall2011.
Monday, June 6, 2011
HMS to design new School of Music at Casper College in Casper, Wyoming
HMS Architects is proud to announce that we have been selected, in association with MOA ARCHITECTURE, to design the new Music Building at Casper College in Casper, Wyoming. HMS Architects are proud to once again be recognized as an industry leader in the design and construction of music education and performing arts work. Our partnership with MOA ARCHITECTURE continues to demonstrate our ability to collaborate with firms of the highest caliber from around the country.
Img source: Casper College Computer Science Department
More information about Casper College
More information about HMS-designed Music Schools, Theaters, and other Performance Projects
Monday, May 23, 2011
LSU Union Theater wins AIA Gulf States Award

The LSU Student Union and Theater has been awarded an AIA Gulf States Merit Award. HMS Architects in association with Grace and Hebert Architects of Baton Rouge were recognized for renovating and revitalizing this campus hub, bringing a refreshed look to this iconic building, while respecting the original design by John Desmond. The project was one of thirteen honored out of a total of over 140 submitted works.
More info on the LSU Student Union
More info on the new LSU Student Union Theater Building
More info on HMS designed Theaters, Auditoriums, and other Performance Venues
Monday, December 13, 2010
South Central Construction announces the Winners of Best of 2010 Construction and Design Awards
Charles B. Montgomery, AIA, ASLA, Principal accepted the following awards for HMS Architecs.
- Award of Excellence for Andrew H. Wilson School for Architectural Design.
- Award of Merit for LSU Music & Dramatic Arts Building Renovation & Additions for Architectural Design
- Award of Excellence for Andrew H. Wilson School for K-12 Education.
Wednesday, December 8, 2010
HMS Architects Presented with Appreciation Plaque by City of Slidell's Department of Cultural & Public Affairs
The sponsors included the East St. Tammany Chamber of Commerce; Living Magazine; Slidell Memorial Hospital; CLECO; Creative Picture Framing Inc. & Art Gallery; Northshore Conifer; Ronnie Kole Foundation; BP Oil; Candlewood Suites; DuBuisson Gallery; Lowry-Dunham, Case & Vivien; The Purple Armadillo; Silver Slipper Casino; The Slidell Independent; Bargains Plus!/Postal Plus; Baskin Robbins/Coy and Donna Faucheux; Chateau Bleu; Councilman Bill & Laura Borchert; Representative Greg Cromer; HMS Architects, APC; Kathryn & Company’s A Touch of Italy Café; Krewe of Bilge; Textron Marine and Land Systems; Times Grill and Dr. Russell & Nancy Westfall.
Wednesday, October 27, 2010
John Q. Adams Middle School Dedication
New Orleans, La. (September 27, 2010) – John Quincy Adams Middle School celebrated the opening of their new Performing Arts Center at the Dedication on September 27, 2010.
A happy crowd was welcomed by Principal, Ginger Bruce. Jay Haydel, Band Conductor led the Adams Band in a musical selection.
Ms. Bruce recognized HMS Architects, APC as the designer of the 6,600 square-foot, state of the art addition that features a performance area with seating for 225, along with a band rehearsal room for 125 students and a proscenium area for school plays, pageants and programs. Other design elements include a percussion practice room for 30 students, two faculty practice rooms, a stage shop, two dressing rooms, and other supporting spaces and offices.
Keynote Address was delivered by Judy Colgan, School Board Member. A tribute to Mr. Paul E. Emenes, Assistant Superintendent 1932-2009 was delivered by Jay Haydel. A tour of the Facility was followed with a reception.
Wednesday, October 13, 2010
Building of America Awards Announces Two Projects by HMS Architects Chosen for Gold Medal Feature
New Orleans, Louisiana ( October 13, 2010):
From hundreds of nominated projects, Louisiana State University, Music & Dramatic Arts Building and Andrew H. Wilson Charter School, both submitted by HMS Architects,APC, has been selected as a Building of America Award projects and will be featured as Gold Medal Winners on the home page at http://www.buildingofamerica.com/.
The Building of America Network showcases the most innovative, unique and challenging new projects — projects that are particularly noteworthy and/or give back to their respective communities. The website is an essential link, bringing owners together with consultants, financial resources, architectural firms, program and project managers and others from within the construction and design industry.
Decision makers can read about the newest facilities joining the landscape in their respective region. More importantly, the Building of America Network provides a tool to help all decision makers learn from one another’s experiences and learn more about the teams behind each project’s success. Each case study will also include listings, advertisements, corporate profiles and additional information about the project team members, subcontractors, vendors and suppliers that were referred as qualified and reliable by the company or firms that chose them for their most important projects.
Tuesday, July 6, 2010
LSU showcases HMS-designed M&DA building
Dean Lawrence Kaptain takes us on a tour of the new Music & Dramatic Arts Building at LSU
http://www.youtube.com/watch?v=B2y32wMGEv4
Slideshow of rededication of LSU Music and Dramatic Arts Building 092009 from Laurence Kaptain on Vimeo.
http://vimeo.com/6816067
Monday, October 26, 2009
LSU Music and Dramatic Arts Building Wins Again

Tuesday, September 15, 2009
HMS-designed Music and Dramatic Arts Building Opens at LSU.
The existing Depression-era Facility was renovated with state-of-the-art spaces, including the Shaver Theatre, a black box theater, dance rehearsal studio, acrobatic rehearsal studio, percussion rehearsal room, scene shop, scene drafting/CADD studio, costume shop, classrooms, piano studio, instrument lockers, practice rooms, faculty offices, administrative offices, and even a student lounge.
Monday, July 6, 2009
HMS Architects receive IIDA Award of Excellence

The Most Highly Regarded Award in the Design Industry IIDA’s Annual Interior Design Competition recognizes outstanding Interior Design and encourages new ideas and techniques in the design and furnishing of interior spaces.
“The winning projects range in size and scope but all exemplify IIDA’s mission to enhance the quality of life through innovation and excellence in interior design.” - Viveca Bissonnette, IIDA, CID, LEED AP, IIDA Vice President of Communications
Jill R. Williams, Designer representing HMS Architects received the award for the renovation design of the Shaver Theater on Saturday June 27 @ the Lowe's Hotel in New Orleans. The Shaver Theater is located in the Music and Dramatic Arts building on the campus of LSU in Baton Rouge, La. This large Italian Renaissance building is recognized in the State Register of Historic Places.
The Shaver Theater had a series of prior additions and renovations resultant in a discordant mishmash of space. HMS Architects restored the visual balance and enhanced the distinctive art deco element of the original 400 seat theater and main lobby. This jewel of a theater can be viewed at http://www.hmsarchitects.com/01-001.xml.
Friday, January 30, 2009
HMS Architects Design the New Fine Arts Annex for Adams Middle School

HMS Architects, a New Orleans based firm, has designed the new fine arts annex for John Quincy Adams Middle School. The ground breaking ceremony took place at a press conference last month.
As a critical part of a childs education, we wanted to reflect those values in our design for the Schools fine arts addition, said Charles Montgomery, Principal of HMS Architects. Our goal was to create something clean, simple and handsome, qualities we believe are integral to students exploration and discovery of art, especially music. The theatres floor is an example of how we incorporated the theme of music in the project, its a motif of piano keys.
The 6,600 square foot, state of the art facility will cost about 1.8 million and feature a performance area with seating for 250, along with a band rehearsal room for 150 students and a 20 by 30 foot proscenium stage for school plays, pageants and programs. Other design elements include a percussion practice room for 30 students, two dressing rooms, two faculty practice rooms, a stage shop and other supporting spaces and offices.
The annex will be finished and ready for students in the spring of 2010.
More about the Fine Arts Center at John Quincy Adams Middle School
More about Durr Heavy Constructions Awards
More about Citadels Awards
LSU Union Renovations to begin

Renovation of largest LSU theater To state-of-the-art facility to take 1 year
Construction of the LSU Union Theater designed by HMS Architects is set to begin. Scheduled to be completed in 2009 the renovation of this 1300 seat theater includes new a completely renovated interior including seating, new side box seating and an entirely new catwalk system. Also added are new inviting multi-story lobbies and circulation spaces, as well as pre-function spaces and new dressing rooms. Most importantly the acoustics of the room are being completely reworked to provide theater quality sound.






























