Wednesday, November 4, 2015

What We Do: Architectural Acoustics: Reverberation time

One of the many things architects can consider in the design of buildings is architectural acoustics.
  • What is it?
    • Reverberation time is basically how "loud" a room or space is.  Specifically, the time (measured in seconds) that it takes for a certain noise level to drop 60 decibels (dB).  The 60 decibel drop is an arbitrary decision to standardize the measurement, but it is a relatively useful choice, given it is about the difference between an orchestra at full fortissimo and the background noise in a room.  
  • Why is it important?
    • Reverberation time contributes (or detracts) from the quality of a space in several ways, in different environments.  Here's a chart showing optimum reverberation times for various rooms.
      • The biggest difference (or at least the most recognized) is made in performing arts environments, one of our specialties.
        • In choral or lyrical instrumental performance environments, a long reverberation time  (like a cathedral) is desirable, stretching and blending the various sounds into one another, adding a great resonance to people's voices, making them sound better.  It's probably no coincidence that people tend to sing in the shower, usually the room with usually the longest reverberation time, due to usually having all hard finishes.
        • In lecture halls or spoken-word environments, a short reverberation time is desirable, as long reverberation times will blend the consonants together, making certain words hard to distinguish.  
        • In practice rooms and rehearsal halls, many musicians prefer to have short-resonance spaces, so as to be able to hear themselves accurately, without the embellishment and "sugar-coating" of a well-designed hall.  (Though, some of us enjoy practicing in reflective stairwells, using the reverberation to fool ourselves into thinking we sound much better than we actually are.) 
      • Outside of performance buildings, reverberation times still make a difference:
  • How do we do it?
    • Reverberation time is usually measured in the field by playing a sound, stopping it, then recording how long it takes for the sound level to drop 60 decibels.  It can, however, be calculated ahead of time by taking the volume of the room (multiplied by a constant), and dividing it by the sum of the total Sabins of absorption in the room.   See here for more detailed information.
    • A sabin, named for the Harvard acoustic researcher who first researched reverberation times, is a measurement of absorption, whose units are curiously measured in area (m^2, or sqft.)  However, to be a useful measurement in sabins, the area is multiplied by a coefficient of how much sound it absorbs.  For example, a square meter (or square foot for imperial units) of open window reflects no sound, and so have a perfect coefficient of 1, and would be measured as one sabin.  Something of the same size that reflects a quarter of the sound back would then be 0.75 sabins.   
    • Notably, since materials will absorb sound differently at different frequencies, a standardized metric, called the Noise Reduction Coefficient (NRC) exists to test a material at four common octave bands; at 250, 500, 1000, and 2000 Hz; (Approx Middle B4, B5, B6, and B7) and average performance between the four.  Typical NRCs vary from 0.70-0.90 for high-absorption acoustic ceilings, to 0.05 for glass, brick, or gypsum board. 
    • These calculations can also be done in reverse, where we take a room of a desired size and desired reverberation time, and calculate out the required absorption needed, which we can then incorporate into the design of the room.   Most projects we do this ourselves, but in highly sensitive cases like music schools and performance halls, we will partner with an acoustical consultant to get it just right.
    • In many cases, the equations can be simplified, and a good reverberation time can be obtained by simply selecting a good ceiling and floor finish.
    • However, in more specialized cases, we often need to add acoustical panels around or in the space, both to absorb sound, and to break up any strong echoes  We also sometimes add movable curtains that can be opened to allow the acoustical qualities of the room to be changed as desired. All of these elements need to be carefully placed, both to work with the acoustic geometry of the rooms, as well as to fit within a coherent room design.
  • When in the process do we do it?
    • Early in the design process, we will take into account the desired volumes of spaces, and select a ceiling and a ceiling height that works for most of the simple spaces
    • Later in the design process, for any particularly complicated or demanding spaces, we will look into any necessary additional acoustic panels or elements, and incorporate them into the design of the spaces.
  • Where are some good examples that we've worked on?
    • Casper College
      • At Casper College, we worked closely with our acoustical consultants to properly balance the acoustics of all the major spaces.   The required acoustic panels were treated as a design opportunity, helping to give character to the various spaces.
      • The main concert hall was made up of glass-fiber-reinforced gypsum panels on the ceiling and walls to evoke the windswept plains of the area, while diffusing the sounds throughout the hall, with absorbing panels at the rear.   There are also absorptive curtains  that can be deployed in front of these diffusive panels that will allow the users to controls the acoustics of the space.
      • In the instrumental and choral rehearsal halls, the adjustable acoustic curtains were hidden by pilasters that, along with the curved acoustic diffuser wall panels, also give detail and a human scale to the large space.  
      • At the percussion rehearsal hall, absorptive wall panels were placed both low and high, to avoid reflective standing waves and flutter echoes, while the mid-height diffusive acoustic wall panels were woven together with both absorptive and diffusive concrete blocks, to accomodate the deeper tones of a percussion suite.  They were carefully placed on the walls as an expression of the common basic rhythms that percussionists play, while additional glass-fiber-reinforced panels from the main auditorium were hung in the space to diffuse the sound from below.
    • Mimosa Park Elementary
      • At  Mimosa Park Elementary we preemptively addressed acoustical concerns about an overly-loud cafeteria space by spraying a acoustical treatment onto the ceiling, adding acoustical panels on all walls, and adding hanging acoustic panels in the center of the space.  This was done early enough in the design and construction process that all of these elements were folded into the coherent design of the cafeteria, instead of tacked on afterwards.
    • JB Martin Gymnasium
      • At JB Martin Gym, we were specifically tasked with fixing the acoustics of an existing gymnasium, that was far too "loud" a space to be useful.   Nearly all speech was unintelligible, even through the loudspeakers, and being in the space during a loud athletic event was almost unbearable.  HMS remedied the situation by applying a sprayed acoustic ceiling to the entirety of the gym ceiling, as well as placing acoustic wall panels at the perimeter, solving the school's problem, even with an increased capacity of the gym.
Overall, reverberation time is one of the many factors that affect a user's perception of a space, and is therefore only one of the many factors we take into account for the design spaces and buildings.


Wednesday, September 2, 2015

FAQ: How Much Does A New Rehearsal Hall Cost: Budgeting For Planning Music Rehearsal Facilities


Pdf version is downloadable here

Casper College Instrumental Rehearsal Hall
Across the country, music educators are making do with the facilities they inherited, often with their programs hampered by the limitations of these spaces.  Renovating or building new music facilities is an inherently complicated exercise, but it is one of our specialties at HMS Architects.  At the risk of oversimplification, here are some ballpark figures based on our current and previous projects, to educate the educators on what is involved in planning a music rehearsal facility.

Detail level of estimates

Estimates typically increase in detail level as the design progresses, and could include costs by rough overall building square footage numbers, room-by-room square footage numbers, or even detailed accounting of every element at the end of design.  However, at the end of the day, all of this is done to estimate the final bids of several contractors who have their own individual methodologies and pressures that affect their bids. 
However, for the purposes of planning projects some years in the future, here are some rough figures and considerations.

Building Efficiency

Building efficiency measures the net usable area in relation to the more commonly used gross overall building area.  This building efficiency varies by building type, but in our experience, music facilities have historically tended to be particularly inefficient, around the 40-60% range.  This means that about half of the overall building area is devoted to non-programmed spaces, including walls, chases, corridors, stairs, restrooms, janitor’s closets, mechanical rooms, etc.

It is worth noting that the building efficiency numbers will rise and fall based on which spaces count as programmed.   Here we are using one of the least forgiving definitions, for simplicity, but it is not uncommon to count restrooms or janitorial areas as programmed spaces, and that would therefore artificially bump up the building efficiency.
For reference, above is a color-coded first floor plan of the HMS-designed Casper College School of Music.   The overall area is shown in grey and black, while only the red areas are programmed spaces, only 56% of the total area, but relatively high for a performing arts facility.  This particular floor is 27,000 SF, and with the second floor above it, the building was 35,000 SF total. The cost of construction was about $12.7 million, in 2012 dollars, a relatively cost-effective $370 per square foot. It is also worth noting that this building includes a performance hall, which is outside the scope of these estimates.
Music facilities tend to be relatively inefficient for many reasons, including increased acoustical wall thickness, wider hallways, etc., that are uniquely necessary for music facilities.   In addition, this ratio will vary based on many factors, including room quantity, site constraints, program or adjacency constraints, and the skill of the architect.  However, all of these factors will historically affect the ballpark 50% efficiency value (and therefore size of the building, and the price) by about 10%. 

For example, if a department is looking for a 6,000 square foot (SF) rehearsal hall, with 3,200 SF of storage, and eight 100 SF practice rooms to round it out, it would add up to 10,000 SF net, but the building may end up being approximately 20,000 SF gross, or about 100 by 200 feet.  Conversely, if someone mentions a 20,000 SF building, there is probably only 10,000 SF of usable space in it.

Cost per Square Foot

The most common comparison of building cost is cost per square foot, usually measured by construction cost divided by gross square footage.  Based on our previous projects, and checked against other music facilities, in 2015, we expect the cost per square foot to be approximately $300-$600 per square foot in 2015 dollars for music facilities.  For the purposes of this article, we will assume $500 per square foot as a reasonable, safe, and round value.  This figure is considerably higher than most building types.  This is a result of the specialty construction necessary to address the acoustic needs of these spaces, including acoustic treatments, theatrical and recording equipment, structure for large open spaces, heavy double walls, acoustically separate structures, and sometimes even entirely separate mechanical systems within the same building.

Cost of Construction (Hard Costs)

The cost of construction is the most common cost referenced.  It is estimated by the architect, but the final cost is the actual bid cost by the contractor who will construct the building.   This price will include all of the labor, materials and profit involved in the construction of the building.
Going back to our example, at $500 per square foot, that 20,000 SF building would be approximately $10M in construction cost.

Soft Costs

This includes furniture, removable equipment, permitting, surveyors, construction testing, and professional design fees for architecture and engineering.   This cost will vary, but is usually about an additional 25% of the cost of construction. 
In our example, that would come out to an additional $2.5M.

Total Project Cost

The total project cost contains the hard cost of construction, combined with the other project soft costs. 
Going back again to our example, the project’s $10M construction cost would translate to a $12.5M overall project cost.

Inflation adjustments

It’s also important to account for inflation and cost increases when planning for future projects.  Construction is subject to market forces, and while there is some volatility, things tend to cost more in the future.
Our example $12.5M 2015 project would have cost only $11.4M only 5 years ago, in 2010, and only 10.2M 10 years ago, in 2005.  Historically, this has amounted to  2-3% a year, or a 10% increase in all costs for every 5 years, but any year could be different.   The data we have has shown an annual increase of 3-8 % in both 2013 and 2014.  This trend is expected to continue at 3-8%, depending on location, in 2015

Common Spaces

Below is a chart showing the approximate costs of common spaces.  Not every building will need every space, and certain programs may be able to easily squeeze into smaller spaces than the full-sized theoretical optimum.  Usually, programs grow from existing spaces, and can re-purpose those spaces for new uses that fit.  Every program, every site, and every need will be different per project, and every building should be carefully tailored by knowledgeable experts to meet those needs, which is why we are here.  However, these numbers should be enough to allow for some long term planning for the future of your music programs.

(As reprinted in the program for the 2015 annual conference of the International Council of Fine Arts Deans)
Pdf version is downloadable here
More about HMS-designed Performing Arts Projects
More about HMS-designed Educational Projects
More about Casper College School of Music

Wednesday, April 22, 2015

Case Study: Renderings vs Reality at Casper College School of Music

In the course of designing the new School of Music building at Casper College, in 2011, we created several renderings to aid in our design decisions for the major spaces, to make sure they look & feel right.  These were also used to show the owner what they could expect as a final product, and also distributed to them to use as promotional materials to drum up support.

The program we used (the then-cutting edge Autodesk Revit 2011&2012,) allowed us (and our consultants) to model the entire building in the computer before anything was built, allowing us to more accurately visualize how the finished product will generally look.  There are several schools of thought in terms of renderings, but we generally strive towards accuracy, minimizing the amount of embellishment.   There are, of course, levels of detail that are not always present.  For example, often we don't need to spend time modeling the light switches and exit signs to get a good sense of the space, but in general, with a more accurate rendering, the client is made aware of the final appearance of the space, and if any problems are found early on, they can be addressed before they become expensive change orders during construction.

When the project was completed, HMS hired a photographer to document the same spaces.  See below for the comparison, to show how closely the renderings (created entirely in the computer while the site was a grass field) compared to the real world building, more than a year later.

Concert hall from back rear.  Rendering is on top, final picture below.  This rendering is from relatively early in the process, and there has been some subtle tweaking of the design during the final CD stage and construction, notably in the upper ceiling and wall panels, and the lower railings.
Concert hall from center.  This rendering has been updated, showing the revised railings, wall panels, and ceiling panels, changed during value engineering.

Instrumental Rehearsal hall.  Rendering is on top, final picture below.   Both views are from the back of the room towards the front, but are from opposite corners - the whiteboard is the same.  For reference, the room is more or less symmetrical, except for the window.  The curtain is adjustable, and can be opened or closed to suit the acoustics of the room.
Choir Room.  Rendering on top, final picture below.  Rendering is fairly accurate, other than missing furniture and curtains, and some slight material inaccuracies with the wooden slats at the top, the ceiling tile material, and the wall diffuser material.
Percussion Suite.  Rough rendering on top, final photo on bottom.   Views are from opposite corners of the same room, facing the same windows.  All the acoustic panels and casework is modeled correctly, although the same ceiling and wall diffuser material issues are present, and the carpet tile was laid in a slightly different pattern.  Notably, the curved acoustic hanging panels needed to be shifted slightly during construction.

Front Lobby.  Rendering at top, final image below.  All the elements are in place, minus the owner-supplied furniture.  The color balance differs slightly, with reality feeling brighter and fresher than the warm and dark rendering.
Main Stair.  Rendering at top, final photo below.  Note how the stair, railing, lights, and benches are all built more or less as drawn, except for a few finishes, selected later.
Upstairs Lobby  Rendering is on the top, with final photo on the bottom.  Geometry is essentially identical, along with colors.   There are only a few  special system and owner-supplied elements missing from the renderings, and the room in general "feels" darker than reality.

For reference, this building was modeled in then-cutting edge Autodesk Revit 2011 and 2012, and rendered in the same program, on our local computers.  Since then, we have continually improved our rendering technology and skills to create better and more-accurate renderings.


Tuesday, October 15, 2013

Casper College Music Building Dedication

Casper College celebrated the completion of their new music building with a dedication ceremony on October 13. The new music building for the college was designed by HMS Architects in collaboration with MOA ARCHITECTURE of Denver. The 34,000 square foot facility provides the music department with an array of spaces including ten music practice rooms, three large music rehearsal spaces, ten faculty studios and a 417-seat Concert Hall. The building located at a prominent campus entrance also features an open two story lobby, music recording suite, two music classrooms and an administrative suite. The total of these spaces provides Casper College with the facilities they need to develop their music program and meet their academic mission.

More about the Casper College School of Music Building at the HMS Architects website
More about HMS-designed music schools and other performance Projects
More about the Casper College School of Music
More about Casper College


Wednesday, October 2, 2013

HMS to host tour of facilities as part of ICFAD conference in New Orleans

HMS Architects are proud to be involved in the International Council of Fine Arts Deans (ICFAD) annual conference celebrating 50 years. HMS is offering a tour of two recently completed fine arts facilities at Louisiana State University. The tour on October 23 will feature the Music & Dramatic Arts building as well as the Student Union Theater. The tour will demonstrate the results of carefully planned renovations.

More about ICFAD and their New Orleans Conference
More about the LSU Student Union Theater
More about the LSU Music & Dramatic Arts Building
More about HMS Fine and Performing Arts projects

Wednesday, November 14, 2012

LSU M&DA Wins AIA Gulf States Award

The Louisiana State University Music and Dramatic Arts building has been given an Honor Award by the Gulf States region of the American Institute of Architects.  According to the jury:  
The architect lovingly restored the existing building and made additions that did not detract or compete with the original structure. The proscenium theater, in particular, was restored to its original glory. The architect inserted new life safety systems unobtrusively, preserving the high spirits of this glorious Art Deco building.
HMS is honored by the building's selection.

From the HMS website:
Louisiana State University built the original Music & Dramatic Arts Facility in 1932. This large Italian Renaissance building is recognized in the State Register of Historic Places, but lacked the modern amenities necessary to properly support the college’s music and theater programs. In addition, the basic common areas were substandard in function and safety.
HMS managed the programming for the entire renovation. The performance spaces needed a significant overhaul, however the academic and support spaces were the largest challenge. The facility needed new classrooms, faculty offices, research rooms, libraries and storage. HMS Team had to first understand the department goals, changing curriculum and class scheduling.
The final design brought new clarity to the circulation and visual balance to a discordant series of prior additions and related buildings. Our solution restores and enhances the distinctive art deco elements of the original 400-seat proscenium theatre and main lobby
The new design overhauls an obsolete building infrastructure while working within the boundaries of a very restricted site and budget.
More about the award at the AIA website (see fourth slide)
More about the award-winning LSU Music and Dramatic Arts Building at the HMS Architects website
More about HMS-designed music schools and other performance Projects

Tuesday, April 3, 2012

HMS Wins AIA Award for LSU Music and Dramatic Arts Building


On March 16th, HMS Architects was awarded an AIA Merit Award for Historic Preservation/Restoration  by the New Orleans Chapter of the American Institute of Architect for our work at the Louisiana State University Music and Dramatic Arts Building. The jury specifically mentioned the care that was taken to restore the old Art Deco Theatre and Lobby.

In 2009 HMS Architects completed the Renovations and Additions to the Louisiana State University Music and Dramatic Arts Building. The project demolished several additions to the original 1928 building and infilled these areas creating a complete envelope which maintained the campus standard look to the exterior. The Art Deco proscenium theatre and lobby were restored, highlighting decorative elements including plaster scrolling, terrazzo floors, marble wainscoting and plaster proscenium. New classrooms, offices, shops and rehearsal spaces were created throughout the building, providing the School with all of their programmatic needs within a historic shell, complete with all of today's technology, comfort, accessibility and life safety needs.


More about the LSU Music and Dramatic Arts Building at hmsarchitects.com

Monday, September 12, 2011

HMS and the LSU Student Union featured in the LSU Alumni Magazine.

The LSU Alumni Magazine has featured the Student Union and its recent renovations in the magazine's Fall 2011 Issue.  The article follows the long history of the building, of which HMS is now proud to be a part, having updated and redesigned the Union Theater.

The article can be found starting on page 30, both embedded below and on the original site at:
http://issuu.com/lsualumni/docs/lsumagfall2011.

Monday, June 6, 2011

HMS to design new School of Music at Casper College in Casper, Wyoming


HMS Architects is proud to announce that we have been selected, in association with MOA ARCHITECTURE, to design the new Music Building at Casper College in Casper, Wyoming. HMS Architects are proud to once again be recognized as an industry leader in the design and construction of music education and performing arts work. Our partnership with MOA ARCHITECTURE continues to demonstrate our ability to collaborate with firms of the highest caliber from around the country.

Img source: Casper College Computer Science Department


More information about Casper College
More information about HMS-designed Music Schools, Theaters, and other Performance Projects

Monday, May 23, 2011

LSU Union Theater wins AIA Gulf States Award


The LSU Student Union and Theater has been awarded an AIA Gulf States Merit Award. HMS Architects in association with Grace and Hebert Architects of Baton Rouge were recognized for renovating and revitalizing this campus hub, bringing a refreshed look to this iconic building, while respecting the original design by John Desmond. The project was one of thirteen honored out of a total of over 140 submitted works.

More info on the LSU Student Union
More info on the new LSU Student Union Theater Building
More info on HMS designed Theaters, Auditoriums, and other Performance Venues

Monday, December 13, 2010

South Central Construction announces the Winners of Best of 2010 Construction and Design Awards

Baton Rouge, La., December 2010 - HMS Architects, a full-service Architectural Firm based in New Orleans, La.  was recognized at the "South Central Construction" award program for the Best of 2010 Construction and Design Awards for the Region, held on December 2, 2010 at Boudreaux Restaurant in Baton Rouge. 

Charles B. Montgomery, AIA, ASLA, Principal accepted the following awards for HMS Architecs.
HMS Architects was founded in 1996 and is recognized for providing sound, creative and enduring design through a collaborative process. Using the very latest technology, talented and experienced staff, and a commitment to collaboration and teamwork, HMS offers accessible communication both within the firm as well as with clients, contractors and consultants.






  

Wednesday, December 8, 2010

HMS Architects Presented with Appreciation Plaque by City of Slidell's Department of Cultural & Public Affairs

The City of Slidell's Department of Cultural and Public Affairs took the opportunity at The Bayou Jam Concert Series on Sunday, October 24, 20101 a Plaque of Appreciation to the city’s 2010 – 2011 cultural season sponsors.   

The sponsors included the East St. Tammany Chamber of Commerce; Living Magazine; Slidell Memorial Hospital; CLECO; Creative Picture Framing Inc. & Art Gallery; Northshore Conifer; Ronnie Kole Foundation; BP Oil; Candlewood Suites; DuBuisson Gallery; Lowry-Dunham, Case & Vivien; The Purple Armadillo; Silver Slipper Casino; The Slidell Independent; Bargains Plus!/Postal Plus; Baskin Robbins/Coy and Donna Faucheux; Chateau Bleu; Councilman Bill & Laura Borchert; Representative Greg Cromer; HMS Architects, APC; Kathryn & Company’s A Touch of Italy Café; Krewe of Bilge; Textron Marine and Land Systems; Times Grill and Dr. Russell & Nancy Westfall.

Wednesday, October 27, 2010

John Q. Adams Middle School Dedication

For Immediate Release
Contact: JoAnn Dugas
504.636.3434

New Orleans, La. (September 27, 2010) – John Quincy Adams Middle School celebrated the opening of their new Performing Arts Center at the Dedication on September 27, 2010.

A happy crowd was welcomed by Principal, Ginger Bruce. Jay Haydel, Band Conductor led the Adams Band in a musical selection.

Ms. Bruce recognized HMS Architects, APC as the designer of the 6,600 square-foot, state of the art addition that features a performance area with seating for 225, along with a band rehearsal room for 125 students and a proscenium area for school plays, pageants and programs. Other design elements include a percussion practice room for 30 students, two faculty practice rooms, a stage shop, two dressing rooms, and other supporting spaces and offices.

Keynote Address was delivered by Judy Colgan, School Board Member. A tribute to Mr. Paul E. Emenes, Assistant Superintendent 1932-2009 was delivered by Jay Haydel. A tour of the Facility was followed with a reception.
##
HMS Architects was founded in 1996 and is recognized for providing sound, creative and enduring design through a collaborative process. Using the very latest technology, talented and experienced staff, and a commitment to collaboration and teamwork, HMS offers accessible communication both within the firm as well as with clients, contractors and consultants.
##

Wednesday, October 13, 2010

Building of America Awards Announces Two Projects by HMS Architects Chosen for Gold Medal Feature

For Immediate Release
Contact: JoAnn Dugas
504-636-3434

New Orleans, Louisiana ( October 13, 2010): 
From hundreds of nominated projects, Louisiana State University, Music & Dramatic Arts Building and Andrew H. Wilson Charter School, both submitted by HMS Architects,APC, has been selected as a Building of America Award projects and will be  featured as Gold Medal Winners on the home page at http://www.buildingofamerica.com/.

The Building of America Network showcases the most innovative, unique and challenging new projects — projects that are particularly noteworthy and/or give back to their respective communities. The website is an essential link, bringing owners together with consultants, financial resources, architectural firms, program and project managers and others from within the construction and design industry.
Decision makers can read about the newest facilities joining the landscape in their respective region. More importantly, the Building of America Network provides a tool to help all decision makers learn from one another’s experiences and learn more about the teams behind each project’s success. Each case study will also include listings, advertisements, corporate profiles and additional information about the project team members, subcontractors, vendors and suppliers that were referred as qualified and reliable by the company or firms that chose them for their most important projects.
#
HMS Architects was founded in 1996 and is recognized for providing sound, creative and enduring design through a collaborative process. Using the very latest technology, talented and experienced staff, and a commitment to collaboration and teamwork, HMS offers accessible communication both within the firm as well as with clients, contractors and consultants.
#
Since 1996, Construction Communications and the Building of America Network have featured the country’s top projects as determined by our editorial board. The case studies are read and referenced by leaders within the region’s local governments, economic development groups, financial institutions, owners, architects and contractors. The website, accessed by industry leaders and decision makers throughout the country, combines more than 50,000 links and millions of searches each year

Tuesday, September 15, 2009

HMS-designed Music and Dramatic Arts Building Opens at LSU.

After an extensive renovation, the Music and Dramatic Arts Building at Louisiana State University is ready for its grand re-dedication, this Sunday, September 20th, 2009.

HMS restored, renovated, and redesigned this historic Art Deco building to house all the functions needed for world-class schools of music, theater, and dance, winning several awards for the end result.

The existing Depression-era Facility was renovated with state-of-the-art spaces, including the Shaver Theatre, a black box theater, dance rehearsal studio, acrobatic rehearsal studio, percussion rehearsal room, scene shop, scene drafting/CADD studio, costume shop, classrooms, piano studio, instrument lockers, practice rooms, faculty offices, administrative offices, and even a student lounge.

To commemorate the occasion, LSU is hosting a series of events over the course of this weekend, culminating in the re-dedication this Sunday.





Monday, July 6, 2009

HMS Architects receive IIDA Award of Excellence





New Orleans, La. June 27, 2009 – HMS Architects was presented with a Award of Excellence by the Delta Regional Chapter of the International Interior Design Association (IIDA) for their work in the interior design of the Shaver Theater at Louisiana State University in Baton Rouge, Louisiana.

The Most Highly Regarded Award in the Design Industry IIDA’s Annual Interior Design Competition recognizes outstanding Interior Design and encourages new ideas and techniques in the design and furnishing of interior spaces.

“The winning projects range in size and scope but all exemplify IIDA’s mission to enhance the quality of life through innovation and excellence in interior design.” - Viveca Bissonnette, IIDA, CID, LEED AP, IIDA Vice President of Communications

Jill R. Williams, Designer representing HMS Architects received the award for the renovation design of the Shaver Theater on Saturday June 27 @ the Lowe's Hotel in New Orleans. The Shaver Theater is located in the Music and Dramatic Arts building on the campus of LSU in Baton Rouge, La. This large Italian Renaissance building is recognized in the State Register of Historic Places.

The Shaver Theater had a series of prior additions and renovations resultant in a discordant mishmash of space. HMS Architects restored the visual balance and enhanced the distinctive art deco element of the original 400 seat theater and main lobby. This jewel of a theater can be viewed at http://www.hmsarchitects.com/01-001.xml.

Friday, January 30, 2009

HMS Architects Design the New Fine Arts Annex for Adams Middle School









HMS Architects, a New Orleans based firm, has designed the new fine arts annex for John Quincy Adams Middle School. The ground breaking ceremony took place at a press conference last month.



As a critical part of a childs education, we wanted to reflect those values in our design for the Schools fine arts addition, said Charles Montgomery, Principal of HMS Architects. Our goal was to create something clean, simple and handsome, qualities we believe are integral to students exploration and discovery of art, especially music. The theatres floor is an example of how we incorporated the theme of music in the project, its a motif of piano keys.



The 6,600 square foot, state of the art facility will cost about 1.8 million and feature a performance area with seating for 250, along with a band rehearsal room for 150 students and a 20 by 30 foot proscenium stage for school plays, pageants and programs. Other design elements include a percussion practice room for 30 students, two dressing rooms, two faculty practice rooms, a stage shop and other supporting spaces and offices.
The annex will be finished and ready for students in the spring of 2010.



More about the Fine Arts Center at John Quincy Adams Middle School




More about Durr Heavy Constructions Awards
More about Citadels Awards

LSU Union Renovations to begin




Renovation of largest LSU theater To state-of-the-art facility to take 1 year


Construction of the LSU Union Theater designed by HMS Architects is set to begin. Scheduled to be completed in 2009 the renovation of this 1300 seat theater includes new a completely renovated interior including seating, new side box seating and an entirely new catwalk system. Also added are new inviting multi-story lobbies and circulation spaces, as well as pre-function spaces and new dressing rooms. Most importantly the acoustics of the room are being completely reworked to provide theater quality sound.